Reconstruction of the Electrical Networks of the Yuria-Pharm II Production Building Complex

EnergoLyuksMontazh is a leader in central Ukraine in performing a full range of electrical installation works - from developing design documentation to commissioning.

Reconstruction of the Electrical Networks of the Yuria-Pharm II Production Building Complex

EnergoLyuksMontazh is a leader in central Ukraine in performing a full range of electrical installation works - from developing design documentation to commissioning.

Image
Image
Image
Image
Image
Image

Reconstruction of the Electrical Networks of the Yuria-Pharm II Production Building Complex

EnergoLyuksMontazh is a leader in central Ukraine in performing a full range of electrical installation works - from developing design documentation to commissioning.

Image
Image

completed projects

Like What You See? Get More Information!

Facility Details:

  • Facility Address: Chyhyrynska St., 21, Cherkasy City
  • Total Capacity: 4320 kW
  • Line Voltage: 10 kV, Category II – 2820 kW, Category III reliability – 1500 kW
  • Metering System: AMR (Automated Meter Reading)
  • Type of Power Line: KL-10 kV with AABl-10 3x240 cable
  • Equipment Type: 10/0.4 kV Transformer Substation, 4xTM-1600/10/0.4
  • Implementation Timeline: 3 months