Construction and Connection to the Electrical Grid of the Solar Power Plant of LEDBUD LLC

Connection of the Industrial Solar Power Plant of LLC "LEDBUD", Located Within the Administrative Boundaries of Trushivska Village Council, Chyhyryn District, Cherkasy Region, with a Total Capacity of 990 kW

EnergoLyuksMontazh is a leader in Central Ukraine in delivering a full range of electrical installation services — from project documentation development to commissioning.

Construction and Connection to the Electrical Grid of the Solar Power Plant of LEDBUD LLC

Connection of the Industrial Solar Power Plant of LLC "LEDBUD", Located Within the Administrative Boundaries of Trushivska Village Council, Chyhyryn District, Cherkasy Region, with a Total Capacity of 990 kW

EnergoLyuksMontazh is a leader in Central Ukraine in delivering a full range of electrical installation services — from project documentation development to commissioning.

Image
Image
Image
Image
Image

Construction and Connection to the Electrical Grid of the Solar Power Plant of LEDBUD LLC

Connection of the Industrial Solar Power Plant of LLC "LEDBUD", Located Within the Administrative Boundaries of Trushivska Village Council, Chyhyryn District, Cherkasy Region, with a Total Capacity of 990 kW

EnergoLyuksMontazh is a leader in Central Ukraine in delivering a full range of electrical installation services — from project documentation development to commissioning.

Image
Image

completed projects

Like What You See? Get More Information!

Project Data:

  • Project address: Within the administrative boundaries of Trushivska Village Council, Chyhyryn district, Cherkasy region
  • Total capacity: 990 kW
  • Line voltage: 10 kV, Category III power supply reliability
  • Metering system: AMR (Automated Meter Reading)
  • Type of power line: 10 kV cable line with AABL-10 3×50 cable, 200 m
  • Type of photovoltaic panels: Monocrystalline RSM60-6-310M
  • Type of equipment: HUAWEI Sun 2000-60KTL M0, RSM60-6-310M
  • Implementation period: 5 months