Total power
4320 kW
Voltage in the line
10 kV, II category - 2820 kW, III category of reliability - 1500 kW
Accounting system
ACEMS
Type of transmission line
CL-10 kV with AABl-10 3x240 cable
Type of equipment
CTS-10/0.4 kV, 4хOT-1600/10/0.4
Implementation period
3 months

WORK PERFORMED

In the period from October 2019 to December 2019, our company completed a full range of works to ensure the reconstruction of the external power supply of Yuria Farm LLC, namely:

  • Design and estimate documentation for the reconstruction of Yuria Farm LLC's networks, replacement and rewiring of transformers at the Yuria Farm LLC's switchgear, replacement of switchgear at the Yuria Farm LLC's 10 kV switchgear and implementation of the AMR system was developed and agreed with the distribution system operator PJSC Cherkasyoblenergo.
  • Power transformers T-1 and T-2 with a capacity of 1600 kW each were replaced in the transformer chamber of the switchgear of Yuria Farm LLC.
  • The switchgear in the 10 kV switchgear of Yuria Farm LLC was replaced.
  • Full legal support was provided and an agreement for the distribution of electricity to the consumer was signed with PJSC Cherkasyoblenergo.
  • The commissioning works were completed and the facility was put into operation after reconstruction.