During the implementation of the project, our team performed a full range of works on the installation and automation of the solar power plant to replace our own needs, namely: The design and estimate documentation for the installation of SES has been developed All equipment and structures have been purchased and delivered to the facility Automation to limit regeneration has been installed Installed on the roof of the SES warehouse, 2 HUAWEI SUN 2000-100KTL-M2 inverters are installed in the VRP-0.4kV Metal structures and photovoltaic modules of the SPP with a capacity of 255.2 kW were installed All electrical installation works and commissioning works have been completed The SES facility of "YURIA-PHARM" LLC has been put into operation.