CONSTRUCTION OF EXTERNAL POWER GRIDS:
- Reconstruction of substation 110/10 to ensure parallel operation of the wind farm with the integrated power system of Ukraine.
- A 7 km long power transmission line with a 110/330 transition was constructed.
- A substation was installed to supply electricity from the wind farm to the grid.
- An ACEMS was installed to operate in the Ukrainian energy market.
- A relay protection and telemechanics system was installed and commissioned.
- The project was put into operation.
- Project implementation period - 8 months