WIND POWER PLANT

A system for supplying power to the unified system of Ukraine was developed. Construction of external power grids.

WORK PERFORMED
CONSTRUCTION OF EXTERNAL POWER GRIDS:
  • Reconstruction of substation 110/10 to ensure parallel operation of the wind farm with the integrated power system of Ukraine.
  • A 7 km long power transmission line with a 110/330 transition was constructed.
  • A substation was installed to supply electricity from the wind farm to the grid.
  • An ACEMS was installed to operate in the Ukrainian energy market.
  • A relay protection and telemechanics system was installed and commissioned.
  • The project was put into operation.
  • Project implementation period - 8 months