In the period from May to July 2019, our organization performed a full range of works to ensure external and internal power supply of the residential complex, namely:
- Design of external power supply networks in accordance with the technical conditions issued by PJSC Cherkasyoblenergo and the AMR system was carried out.
- At the connection point, two 10 kV cells were installed in the newly constructed substation of another residential complex.
- A 10/0.4kV switchgear was installed at the Pearl of the Dnipro residential complex with 2x1000kVA transformers, and the switchgear was grounded.
- Two 10 kV cable lines were laid to the KTP-10/0.4 kV on Heroiv Stalingrada Street.
- The length of the route was 900 meters.
- Metering on the 10 kV side was organized and the AMR system was implemented.
- Full legal support was provided, an agreement was signed for the distribution of electricity and power supply to the Perlyna Dnipra residential complex, and the facility was put into operation.