In the period from October to December 2018, our company completed a full range of works to provide external power supply to the residential complex, namely:
- The design of external networks was carried out in accordance with the technical specifications issued by Cherkasyoblenergo PJSC.
- At the connection point, two 10 kV cells were installed in the networks of PJSC Cherkasyoblenergo.
- A 10/0.4kV switchgear building with 2x1000kVa transformers was constructed in Novyi Parkovyi residential complex and grounded.
- Two 10 kV cable lines were laid to the 10/0.4 kV switchgear, with a puncture through 30-richchya Peremohy Street. The length of the route is 400 meters.
- Prefabricated cells were installed and wired in the 10kV and 0.4kV switchgear.
- Metering on the 0.4kV side was organized and the AMR system was implemented.
- Full legal support was provided, an agreement for the distribution and consumption of electricity was signed, and the facility was put into operation.