In the period from March to July 2020, our company completed a full range of works to provide external power supply to the residential complex, namely:
- Design and estimate documentation for external and internal networks was developed in accordance with the technical specifications issued by PJSC Cherkasyoblenergo.
- At the connection point, two 10 kV cells were installed in the networks of PJSC Cherkasyoblenergo.
- A 10/0.4 kV switchgear building with 2x1600 kV transformers was constructed and grounded.
- Two 10 kV cable lines were laid to the 10/0.4 kV switchgear. The length of the route is 500 meters.
- Prefabricated cells were installed and wired in the 10kV and 0.4kV switchgear.
- Metering on the 0.4 kV side was organized and the AMR system was implemented.
- Full legal support was provided, an agreement for the distribution and consumption of electricity was signed, and the facility was put into operation.
- The second stage of work:
- The 0.4kV switchgear of the buildings was installed and grounded.
- 0.4kV cable lines were laid from the 0.4kV switchgear to the switchboards of the buildings.
- Apartment meters were installed and a full range of works on the installation of internal electrical networks was completed