RESIDENTIAL COMPLEX "FOREST"

Connecting to power grids RC "Forest"

Power supply of a multi-storey residential building with built-in and attached public premises at 8, 30-richchya Peremohy Street in Cherkasy.
Data about the object
TYPE
DATA
Address of the object
30-letiya Peremohy Peremohy St., 8, Cherkasy.

Total power
1130 kW
Line voltage
10 kV, II category of power supply reliability
Accounting system
AСEMS
Type of power lines
CL-10kV by cable AABL-10 3x120
Type of equipment
2xTM-1600/10/0.4 and 10/0.4kV substation
Realization period
5 months
WORK PERFORMED
In the period from March to July 2020, our company completed a full range of works to provide external power supply to the residential complex, namely:

  • Design and estimate documentation for external and internal networks was developed in accordance with the technical specifications issued by PJSC Cherkasyoblenergo.
  • At the connection point, two 10 kV cells were installed in the networks of PJSC Cherkasyoblenergo.
  • A 10/0.4 kV switchgear building with 2x1600 kV transformers was constructed and grounded.
  • Two 10 kV cable lines were laid to the 10/0.4 kV switchgear. The length of the route is 500 meters.
  • Prefabricated cells were installed and wired in the 10kV and 0.4kV switchgear.
  • Metering on the 0.4 kV side was organized and the AMR system was implemented.
  • Full legal support was provided, an agreement for the distribution and consumption of electricity was signed, and the facility was put into operation.
  • The second stage of work:
  • The 0.4kV switchgear of the buildings was installed and grounded.
  • 0.4kV cable lines were laid from the 0.4kV switchgear to the switchboards of the buildings.
  • Apartment meters were installed and a full range of works on the installation of internal electrical networks was completed