Performance of works at the facility under the contract "Capital construction of engineering networks and power supply for special purpose facilities".

Data about the object
TYPE
DATA
Total power
650 kW
Voltage at the connection point
35 kV
WORK PERFORMED
  • Design and estimate documentation was drafted for the construction of a 35/10 kV substation and agreed with the operators of the distribution system:
  • Work on the construction of a 35/10 kV substation was performed;
  • Complete 10/0.4 kV transformer substations were constructed;
  • 10 kV, 0,4 kV power supply networks, and outdoor lighting networks were constructed;
  • An automated system of commercial electricity accounting was implemented;
  • A telemechanics system was implemented to transmit data to the operations control center;
  • Work on the installation of a lightning protection system for the facility was performed;
  • Work on protection relay and emergency automation adjustment was performed;
  • All tests and commissioning works have been completed;
  • The facility was fully brought into operation;
  • Complete legal support in terms of the conclusion of consumer and producer distribution agreements.